Brigade CFDSB Guide d'installation Page 31

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 30
31
Performance Checklist
—Verify cabinet size.
Verify electrical supply and water
supply (if applicable).
Install anti-tip device(s) and verify unit
is secure.
Position unit in cutout, level at desired
height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
• Verify icemaker fi ll tube is properly
inserted.
• Verify icemaker bail arm is down.
Verify dispenser operation
(if applicable).
—Align/square door(s).
Verify drain pan is properly installed
and there are no leaks on water
connection.
—Install kickplate.
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:__________________________
Installer’s company:_______________________
Date: ___________________________________
Vue de la page 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36

Commentaires sur ces manuels

Pas de commentaire