Performance Checklist
Verify cabinet size.
Verify electrical supply and water supply
(if applicable).
Install anti-tip device(s) and verify unit is secure.
Position unit in cutout, level at desired height
and secure unit.
Plug-in unit and verify operation.
Connect water supply (if applicable).
• Verify icemaker fill tube is properly inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
Align/square door(s).
Verify drain pan is properly installed and there
are no leaks on water connection.
Install kickplate.
Remove internal packaging and labels and wipe
unit down.
Installer’s information:
Installer’s name:_____________________________
Installer’s company:_________________________
Date: ________________________________________